The category of "Operation & Maintenance" is a wide range of activities, including but not limited to review/update production operation documents & procedures, lead/participate in design reviews, HAZOP, IPF, HAZID, surface facilities. The SP will have the capabilities to do more than whist’s mentioned under this category. For more details, please click the on the SP name above.


  • Category: Operation & Maintenance
  • Est. Regist./Booking Time: 5 Minutes
  • Address: Muscat, Oman (Map)
  • Service / Consultation Fee (OMR/HOUR):20

 

Description

SP / Client Free introduction

Name: HUS.BAH. 62056c53b3885

Main Focus Area: The SP in the "Operation & Maintenance" category will have the capabilities to work on the review/update of Production operation documents & procedures, lead/participate in design reviews, HAZOP, IPF, HAZID, surface facilities, terminal and offshore operations, Mechanical, Instrumentation, Electrical, Commissioning & start-up, integrity & inspection, production chemistry, static equipment & pipeline, rotating equipment, Turnaround, Facility Shutdown, Integrated Activity Planning.

Existing type of employment: Employed/Staff

Number of years since last employed: 10

Existing / Previous Job Management Level: Junior management 

Professional Experience: Over 10 years of expertise in the oil and gas industry in Operation & Maintenance, with a focus on instrumentation, electrical, Commissioning and Automobile. Performed all required maintenance, planned preventative maintenance, corrective maintenance, calibration and testing of process control and safety systems on Gas Processing Plant, troubleshooting and optimization tasks for oil production facilities. Carried out all type of routine activities, breakdown maintenance, fault finding, troubles shooting, shutdown activities, calibration and commissioning of instruments in an oil and gas gathering station. Alarm Management & Rationalization, Focal Point and Programmable Logic Controller: HIMA, FSC (Honeywell). Interpreting system P&IDs, Logic Drawings, Loop Diagrams, Cause and Effect Diagrams, and layout drawings to plan and carry out system maintenance, as well as system isolations and overrides. Fire and gas & ESD system including Infrared, IR-Gas detectors, smoke detectors, oil mist detectors, and Toxic gas detection system. Using Permit to Work Systems (E-PTW/ eCOW), carry out site visits, Risk Assessments, toolbox talks, HSE-Safety Rules, and Regulation, Various types Hazard’s and Hazardous Area, SAP System.

Skills & Competencies: 

  • Technical skills on Instrumentation;
  • Electrical circuit, maintenance and construction; 
  • PTW system;
  • Fire & Gas ESD system;
  • Commissioning;
  • Drawing interpretation;
  • Alarm Management; 
  • Rationalization;
  • PLC System.

Qualification: 

  • BEng (Hons) Instrumentation and Control Engineering University of the West of England - UWE Bristol. 
  • Diploma of Electrical power Technology. Nizwa College of Technology. 
  • (LEVEL 3 NVQ Diploma in Engineering Maintenance Instrumentation and Control).

Place of Domicile: Muscat

Work preference & Max. distance to work site from domicile: Onsite/Online unlimited mileage

DoB: 1986

Prerequisites

  • Please click BOOK/REGISTER button and fill in the form.
  • Clients are requested to check and verify the SP's profile prior to the selection of SP and ensure it meets their requirements.
  • The selected SP's contact details will be sent to the client via email once registration/booking fees is paid.
  • The introduction (max. 1 hour) is free of charge for all clients and does not bind to hire the SP.
  • A contract/agreement between the two parties shall be generated immediately and signed by both parties after the work assignment has been agreed during the introduction.
  • For every genuine and agreed work assignment, TAF will charge a fee of double the hourly rate stipulated in the SP Registration Form, shared 50% between the SP and the client.
  • The SP will invoice directly the client according to the contract/agreement terms and conditions. No fees or a turnover commission is paid to TAF.
  • The hourly rate of the SP is as indicated in the application. Other expenses, if any, have to be agreed during the introduction.
  • Clients must commit to having an actual project/work assignment and TAF must be informed if additional SP is required for the same project.

SP Booking